Add

RCC issue

I am a newly recruited site engineer so i am having a doubt. In the design drawing it was done based on M25 concrete and Fe500 steel and while making the BoQ we have mentioned M20 and Fe500. Now we are bound to go with M20 as per the BoQ since the contract has been […]

The post RCC issue appeared first on The Constructor.

No comments:

Post a Comment