During manual concreting of a raft footing which was designed for M25 grade concrete, the estimated cement required was 240 bags, while the laborers due to sheer negligence have added only 140 bags. The Soil conditions are good. There was more coarse aggregate added. What is the possibility of failure and what could be the […]
The post What is the Possibility of Footing Failure with Reduced Cement Content? appeared first on The Constructor.
No comments:
Post a Comment