Add

What is the Minimum Curing Period for Concrete?

The minimum curing period for concrete is controlled by the type of cement used, ambient temperature, type of construction (size and shape of concrete member), designated strength, and curing regime. For the majority of concrete structures, the minimum curing period at temperatures higher than 5°C is seven days or until the concrete strength reaches 70% […]

The post What is the Minimum Curing Period for Concrete? appeared first on The Constructor.

No comments:

Post a Comment